Realized projects

Assembly line - gradual insertion

Assembly line - gradual insertion

Double assembly line for increased productivity.

Reference detail

Transport system to the test room

The transport system ensures the supply and removal of stator windings to and from the test room.

Reference detail
Transport system to the test room
Assembly line for assembling stairs and drives of door systems

Assembly line for assembling stairs and drives of door systems

The project comprehensively solved the completion of individual nodes of stairs and door systems so that all ergonomic requirements were met when handling operators.

Reference detail

Transport system for surface treatment for CIDEM Hranice

The transport system of painted cement-bonded particleboards was designed as a service system for the painting line. Handling is ensured by means of roller conveyors and transfer trolleys at the entrance and exit of the paint shop.

Reference detail
Transport system for surface treatment for CIDEM Hranice
Sorting line of printed matter and remittances R.E.T. Olomouc

Sorting line of printed matter and remittances R.E.T. Olomouc

Sorting line of printed matter and remittances for the branch office of the periodicals distribution. The sorting line was designed for the existing hall. The components and frames of the existing belt conveyors were used to the maximum extent.

Reference detail

What we live in DAS

Did we interest you? You will not pay anything for a request

Fill in the demand
logo
logo
logo
logo